Greenhouse Heating Requirements: Table 2
| Construction System | Air Exchanges/ Hour |
| 1. New construction, glass or fiberglass | 0.75 to 1.5 |
| 2. New construction, double layer PE | 0.50 to 1.0 |
| 3. Old construcyion, glass, good maintenance | 1.00 to 2.0 |
| 4. Old construction, glass, poor condition | 2.00 to 4.0 |
(Low wind or protection from the wind reduces the air exchange rate)